Back to insights

Case study — Eliminate Waste

From 2 Hours to 10 Minutes

Trading repetitive tasks for real results

Client
Automated equipment manufacturer
Team
3-person buying team
Project length
3 weeks
Download the PDF

Before

2+ hours a day

Manually pulling drawings to release POs

After

10 min or less

Tool pulls drawings automatically

  • Buyers control their own day and how they release POs
  • Time returned to supplier management, cost savings and performance work

What the client wanted

Remove wasted effort on routine, low-value tasks.

The challenge

A small buying team supporting a fast-moving operation was spending more than 25% of its time on low-value, repetitive work: manually pulling drawings to release POs. That left little room for the higher-value work that saves money, manages suppliers and improves performance, so those tasks kept getting pushed back.

The approach

  1. 01Assessed the team's existing process and tools.
  2. 02Mapped the current process to see where the time was going.
  3. 03Built a tool that pulls drawings from their vault automatically, in minutes instead of hours.

The point of impact

Flexible, human-in-the-loop automation. The buyer stays in control of how and when POs get released, whether that means reviewing the full requisition list or pulling just a few drawings. The tool fits the way they work, so they saved time and energy for the work that matters most.

“Using this tool is the best part of my day now... the hours saved gave me back the time I needed to support the operations and delivery on my objectives.”
Buyer, automated equipment manufacturer

What made it work

Find the manual, repetitive tasks and build simple but effective tools. It wins every time.

Next step

Want hours of low-value work turned into results?

Start with a free assessment. First conversation is free — we'll tell you straight whether we can help.